WikiWirral is where great friendships are made.
Forum Statistics
Forums65
Topics76,521
Posts1,034,231
Members14,935
Most Online121,890
Sep 24th, 2025
Who's Online Now
10 members (1 invisible), 56,959 guests, and 384 robots.
Key: Admin, Global Mod, Mod
Top Posters
sunnyside 45,164
MattLFC 22,315
Mark 21,269
granny 17,811
_Ste_ 16,347
Newest Members
saltchunkmary, Suzie00, Gizbeech, TexM1, lowkixlowri
14,935 Registered Users
New General Forums
Do we need Trident?
by derekdwc - 20th Jan 2016 1:11pm
New Wirral History
Heswall and "Yowlers"
by neil1024 - 22nd Jan 2025 11:36am
227 Hornblowers
by - 2nd Jan 2009 10:35pm
Top Posters(30 Days)
mikeeb 2
Topic Replies
Can anyone beat the word Jigger for all its different meanings
by diggingdeeper - 13th Dec 2025 12:28am
Willaston
by Gizbeech - 12th Dec 2025 10:54am
Moreton mere brickworks
by Gizbeech - 12th Dec 2025 10:31am
Heswall and "Yowlers"
by neil1024 - 12th Dec 2025 10:22am
Do we need Trident?
by diggingdeeper - 10th Dec 2025 4:35pm
Kimpri (Joe)
by derekdwc - 1st Dec 2025 2:18pm
227 Hornblowers
by diggingdeeper - 20th Nov 2025 8:33am
CW Chat room thread
by eggandchips - 19th Nov 2025 11:04am
Hind Street development
by Excoriator - 18th Nov 2025 3:20pm
December
M T W T F S S
1 2 3 4 5 6 7
8 9 10 11 12 13 14
15 16 17 18 19 20 21
22 23 24 25 26 27 28
29 30 31
Top Likes Received (30 Days)
None yet
Top Likes Received
bert1 29
Mark 4
casper 4
Previous Thread
Next Thread
Print Thread
_
_jase_
Unregistered
_jase_
Unregistered
_
[Linked Image]


Month of track repair in Wirral 'Loop' set to begin



A MONTH of work to repair the track in Merseyrail's Wirral loopline begins on Good Friday.

The £3.4 million project is part of a five-year £20m scheme to replace the entire track on the curved sections beneath the city centre by the end of 2009.

The work starts on Good Friday, April 10 and continues until Tuesday May 26, during which time all services from Chester and the Wirral lines to Liverpool will terminate at James Street station.

A bus shuttle will run from James Street to Lime Street station only. But Northern Line and main line services are not affected by the work.

Network Rail say passengers in Chester and Wirral will benefit from the latest phase of track renewal on the Liverpool underground railway.

Simon Whitehorn, Network Rail's area manager Merseyside said: "The renewal of the track brings benefits for everyone. Passengers get a better quality ride, it causes less wear and tear on Merseyrail's fleet of trains and the new track needs less maintenance by us."

Bart Schmeink, Merseyrail's managing director, added: "This kind of major engineering project will inevitably cause some inconvenience to our passengers.

"I am sorry that Wirral line passengers will have to put up with this but the end result will be a better and more reliable railway so it's worth the short term pain for the long term gain."

Tony Garrett, from Wirral Transport Users Association said: "It's a great inconvenience to passengers and residents from Wirral, particularly mothers with prams, peoople with mobility problems having to climb the old iron stairs at James Street to get to a lift, particularly with luggage, baggage and bicycles.


THE GLOBE

Google Ads
Joined: Apr 2008
Posts: 13,487
Likes: 1
Green Meanie
Wiki Master
Offline
Green Meanie
Wiki Master
Joined: Apr 2008
Posts: 13,487
Likes: 1
this means i be getting off at jame street then! no


[Linked Image] Please do not adjust your mind, there is a slight problem with reality
Joined: Jan 2008
Posts: 528
Likes: 1
Smartchild
Offline
Smartchild
Joined: Jan 2008
Posts: 528
Likes: 1
oh for christ sake not again frown more lates in work, i can bet that the shuttle service won't run smoothly.

P
Pinzgauer
Unregistered
Pinzgauer
Unregistered
P
Since day one of the Loop Line opening, over 30yrs ago, the problems of rapid rail wear have bugged the system. The average lifespan of plain track is about 10ys. On the Loop - about 2yrs !!

The radius of the curves are too tight! They got that one wrong at the planning stage ! On its own this leads to rapid wheel flange wear and wear on the rail head. Added to this is the problem of severe corrosion of the rails and their fastenings. The single line bores were made with "weep holes" to let ground water in. Trouble being is that the ground water/water table is continuing to rise. Additional pumping has been installed on several occasions, but more and more water floods in !

This also affects the track circuiting (signals) leading to random faults/delays. After the derailment outside L.Cen a while back, a report was published. In this report, bad track maintenance was a factor. Pictures show the advanced corrosion of the rail fittings. Drainage ducts etc. awash with rubbish that was never cleaned up. The running rails and fittings are always wet. Leakage currents/electrolytic action adds to the mix.

PROPER maintenance costs money! Sharholders in private companies don't like ongoing megabucks being spent for no return.

Being of "a certain age", I remember when the Mersey Railway ran on the 4 rail system. The insulated centre "return/negative" rail meant NO (electrical) leakage. The 3 rail system uses the running rails as a negative return. Not all that great in wet conditions when working with DC.

It will be interesting to see what they do with £20 million. In another 2 or 3 years, some old git will be ranting on about the Loop being closed again for track renewal !!!

Rant suspended !



Joined: Aug 2008
Posts: 8,620
H4H County Volunteer
Wiki Veteran
Offline
H4H County Volunteer
Wiki Veteran
Joined: Aug 2008
Posts: 8,620
Why do they have to start it over the Easter weekend ffs - idiots!!!

There's bound to be "out of towners" wanting to cross the Mersey either way, what kind of image does it give them?? "Did you enjoy your weekend?" "Not really, had to get bus, then train, then bus to do a simple journey because some numbnut thought it a good idea to sort train tracks out".

EPIC FAIL!! noonoo


Sometimes Police Officers give more than just speeding tickets!

It�s hard to be fit as a fiddle when you�re shaped like a cello!
Joined: Aug 2007
Posts: 2,990
Are you SoNutz?
Forum Master
Offline
Are you SoNutz?
Forum Master
Joined: Aug 2007
Posts: 2,990
Basically the whole time ive been riding to liverpool ive been riding on broken track *basically thats what it is if there replacing everything* Inregards to JAMES Street station why not use the 2 stretch of track for 2 journeys 1 for people without bikes , prams etc etc and the other for prams and stuff i.e. The side with the lift use for prams and the side with the iron steps use for the buisness people an people who dont give a sh** about a lift etc... Well you know what i mean i'll leave it at that.......


Lee Mills

Joined: Apr 2006
Posts: 12,369
Likes: 2
Wiki Master
Offline
Wiki Master
Joined: Apr 2006
Posts: 12,369
Likes: 2
Again?!

They closed it about two years ago to replace track and had months of problems and delays afterwards due to increased wear.


Autowirral.co.uk - The Northwest's Biggest forum of Motoring Enthusiasts.
Cruisewirral.com - The Northwest's Biggest forum of Modified Car Enthusiasts.
Joined: Feb 2009
Posts: 516
Smartchild
Offline
Smartchild
Joined: Feb 2009
Posts: 516
and they wonder why we like using cars


[Linked Image]
Joined: Jan 2008
Posts: 528
Likes: 1
Smartchild
Offline
Smartchild
Joined: Jan 2008
Posts: 528
Likes: 1
My uncle actually tested the track alignment on the loop line before it went into service in the early 70's, it was o.k then wink

Joined: Apr 2008
Posts: 131
Enthusiast
Offline
Enthusiast
Joined: Apr 2008
Posts: 131
Just use the spare rails from the tram system! wink


Moderated by  Mod 

Link Copied to Clipboard
Random Wirral Images

Click to View Topic.
Newest Topics
Moreton mere brickworks
by Gizbeech - 12th Dec 2025 10:31am
Kimpri (Joe)
by derekdwc - 20th Nov 2025 10:51am
Hind Street development
by Excoriator - 18th Nov 2025 3:20pm
New Ferry regeneration
by Excoriator - 16th Mar 2025 3:22pm
For Sale & Free
Member Spotlight
phillhere
phillhere
Greasby
Posts: 60
Joined: October 2008
Today's Birthdays
There are no members with birthdays on this day.
New Wirral Info
News : New Topics
Kimpri (Joe)
by derekdwc - 20th Nov 2025 10:51am
Hind Street development
by Excoriator - 18th Nov 2025 3:20pm
New Ferry regeneration
by Excoriator - 16th Mar 2025 3:22pm
New Enthusiast Forums
Moreton mere brickworks
by Gizbeech - 12th Dec 2025 10:31am
Willaston
by Erainn - 19th Jun 2020 2:48pm
CW Chat room thread
by - 31st Dec 2005 10:42pm
Popular Topics(Views)
10,729,974 CW Chat room thread
5,897,075 WIKI WALK CHAT
4,632,804 Spotted!
Powered by UBB.threads™ PHP Forum Software 7.7.5