wirral forums

Three More Cranes for Liverpool 2.

Posted By: Wally1

Three More Cranes for Liverpool 2. - 1st Dec 2019 5:01pm

The ship Zhen Hua 25 is due at the Bar at 03:00 tomorrow with three more
cranes for Liverpool 2. The ship is expected at Liverpool 2 around 14:00
(High Water). The cranes will join the existing five already in use on the
quayside opposite New Brighton.
Posted By: Greenwood

Re: Three More Cranes for Liverpool 2. - 1st Dec 2019 10:51pm

That should be quite a sight! I remember when the first lot arrived.If you can't get down to the waterfront, www.wirralcam.org has webcams that show the Seaforth area.
Posted By: Wally1

Re: Three More Cranes for Liverpool 2. - 2nd Dec 2019 12:41pm

Zhen Hua 25 now approaching Bar - due Liverpool 14:00 approx.
Posted By: Wally1

Re: Three More Cranes for Liverpool 2. - 2nd Dec 2019 3:43pm

Entering the river and passing existing cranes..

Attached picture DSC_0019.JPG
Attached picture DSC_0021.JPG
Posted By: diggingdeeper

Re: Three More Cranes for Liverpool 2. - 2nd Dec 2019 4:55pm

Excellent, thanks!
Posted By: Wally1

Re: Three More Cranes for Liverpool 2. - 8th Dec 2019 1:47am

Two cranes now unloaded, one still to go.
Posted By: Wally1

Re: Three More Cranes for Liverpool 2. - 8th Dec 2019 12:01pm

One still on ship on left and two on quay to right..

Attached picture DSC_0002.JPG
Posted By: Wally1

Re: Three More Cranes for Liverpool 2. - 14th Dec 2019 2:21am

Final crane now unloaded.
Posted By: Wally1

Re: Three More Cranes for Liverpool 2. - 17th Dec 2019 2:06am

Zhen Hua 25 left Monday.
Three new cranes on quay.

Attached picture DSC_0010.JPG
Attached picture DSC_0008.JPG
© 2020 Wirral - wikiwirral.co.uk