well my 40mm kit arrived so I set about fitting it today
Bike on center stand and on top of 2 40mm slabs (the rear wheel will drop down once the old links are taken out) Rear break/footrest undone and held out the way and the same for the gear pedal/footrest on the other side.
Rear wheel supported by bricks to take the weight off the links as they are undone.
Rug to keep me off the cold floor lol and gear pedal/footrest removed
old kit out and 2 new gold 40mm links
left and right side fitted (not tightened)
mmm grease
All Done
Took just over half an hour to complete
I haven't been out on it yet to try out the handling but it feel's a lot higher to sit on so good times
Next up... indicators or something else