Agreed with all that, but can I have a mini rant of my own? Yesterday the Docks and Harbour Board idiots in their infinite wisdom raised the Duke St bridge at 9.05am to let some floating rustbucket through, just at the peak of rush hour when everyone was trying to get to work. Result, three crossings to Birkenhead reduced to one at a time of peak traffic. Nice one guys.
And some selfish twunt in a pickup truck crossing the Duke St/Clevelend St junction stopped in a queue of traffic right in the middle of the box junction (you know, don't enter the box until your exit is clear?) and caused massive tailbacks in all four directions. If that was you, I hope your nads turn black and drop off.